PBS provided engineering, surveying, fish passage, and natural resource services to replace an 80-year-old bridge that ran diagonally through the intersection.
Federal permitting was required due to the presence of Endangered Species Act-listed fish in Garrison Creek, and because the Army Corps of Engineers controls the flows in the stream.