PBS coordinated closely during severe winter weather with the goal of completing the field work for design and construction of a newer, safer bridge.
  Clint Nealey, PE, Geotechnical Staff Engineer

PBS worked with TranTech Engineering to design and develop bid documents for a 2-span, 320-foot-long precast concrete bridge over the Touchet River to replace the existing deficient structure.

Dell Sharpe Bridge Replacement 4
Dell Sharpe Bridge Replacement 6

This project features a new roadway alignment of Petty John Road to facilitate the proposed crossing location, realignment of existing access roads on the south side of the bridge, with support of the new bridge on large diameter drilled shafts socketed into rock.

Client
TranTech Engineering
Location
Walla Walla, Washington
Services
Civil Engineering, Environmental Services, Geotechnical Engineering, Natural Resources, Surveying
Sector

Explore Our Projects

Skip to content