ENGINEERING • ENVIRONMENTAL • SURVEY

Wenatchee Creek Bridge Replacement

 Grande Ronde, Washington
PROJECT PROFILE
This survey was used to redesign a bridge along a popular and remote road that posed a safety issue due to it being a single lane bridge with low visibility.
  Greg Flowers, PLS, CFedS, Senior Survey Manager

PBS surveyed the current conditions of an existing one-lane bridge on Grande Ronde Road, crossing Wenatchee Creek, along with approaches using a combination of GPS, traditional, and UAS (drone) survey methods.

Wenatchee Creek Bridge Replacement 2
Wenatchee Creek Bridge Replacement 3

The adjacent property ownership delineation was determined, and PBS worked with Asotin County and landowners, including the Washington State Game Department, to establish the right-of-way necessary for the bridge replacement and road improvements.

Client
Murraysmith
Location
Grande Ronde, Washington
Services
Land Surveying, Unmanned Aircraft Systems (UAS)
Sector

Explore Our Projects

Skip to content