North Terminal Bollard & Rivergate Plant Pile Repair

 Portland, Oregon
PROJECT PROFILE
This project potentially saved the client millions of dollars—minimizing disruptions to operations.
  Gary Stensland, Principal, Natural Resources Manager

PBS developed a pile repair scheme as an alternate to full replacement of
the causeway, hinge conveyor support, and pedestrian access bridge.

North Terminal Bollard 4
Ash Grove

To provide safer warping, a new 100-ton bollard was installed on the main dock, midway between two dolphins.

Installation of the bollard required locally reinforcing the dock to receive the load and transfer it throughout the system.

Client
Ash Grove Cement Company
Location
Portland, Oregon
Services
Environmental Services, Natural Resources, Structural Engineering, Surveying
Sector